NEW CONSTRUCTION

INSPECTIONS


(VHS FORMAT EXTRA CHARGE) DIGITAL CAMERA  PICTURES ARE TAKEN OF PHASE I  (FOUNDATION)   PHASE II (ROUGH FRAMING, ELECTRICAL, PLUMBING)  PHASE III  (COMPLETION OF EVERYTHING EXCEPT FLOORING.


THE DIGITAL PICTURES ARE PRINTED WITH TEXT INFORMATION AND FULL DOCUMENTATION IS GIVEN TO THE BUYER AT EACH PHASE OF CONSTRUCTION. PHASE IV IS A FINAL WALK THROUGH WITH THE BUYER AND OUR  12  PAGE GENERAL INSPECTION REPORT ( A.S.H.I. STANDARDS OF PRACTICE ) IS COMPLETED AT THIS TIME.


BEFORE INSPECTION

AFTER  INSPECTION

Can an Inspection make a difference ?